Reorder level formula: the short answer
Reorder level = average daily sales × lead time in days + safety stock. When the stock of an item falls to this number, you place the order, so the new stock arrives just before the shelf goes empty.
For example, if you sell 8 packets a day, the supplier takes 3 days to deliver, and you keep 2 days of extra stock (16 packets) as a cushion, your reorder level is 8 × 3 + 16 = 40 packets. When you count 40 or fewer, order.
The three numbers you need
| Number | What it means | Where to get it |
|---|---|---|
| Average daily sales | How many units of this item you sell on a normal day | Your sales of the last 4 to 8 weeks, divided by the days you were open |
| Lead time | Days from placing the order to the stock being on your shelf | Your own record of the last few orders, not the salesman's promise |
| Safety stock | Extra stock kept for a busy day or a late delivery | A few days of sales, chosen by how bad a stock-out is for that item |
Average daily sales
Take the quantity sold over the last 30 to 60 days and divide by the days the shop was open. Two things spoil this number. First, festival days: if Onam or Diwali week falls inside your period, the average comes out too high for a normal month. Second, days when the item was out of stock: you sold zero because you had zero, not because nobody wanted it. Leave those days out of the count, or the average comes out too low and you keep running out.
Lead time
Lead time is not just the delivery time. It runs from the moment you decide to order to the moment the stock is priced and on the shelf. If you place orders only in the evening, the salesman delivers in two days, and you unpack the next morning, your real lead time is closer to three days than two.
Safety stock
Safety stock covers the days when sales are higher than usual or the delivery is late. Two simple ways to set it:
- Days of cover: keep 1 to 3 days of sales extra for items with steady sales and reliable suppliers, more for items where suppliers are often late.
- Worst case minus normal case: safety stock = (highest daily sale × longest lead time) − (average daily sale × average lead time). This is a common textbook method and suits items whose sales jump around.
Give more safety stock to items that bring customers in (milk, atta, rice, oil, a popular brand of tea) and less to items people can wait for or replace with another brand.
How much to order: the reorder quantity
The reorder level tells you when. The reorder quantity tells you how much. A practical way for a shop is to set a maximum level and order up to it:
Maximum level = average daily sales × (lead time + days until the next order) + safety stock
Order quantity = maximum level − stock in hand − stock already ordered but not received
Then round to the case or box size. If an item comes in cartons of 24 and your sum says 50, order 48 or 72 depending on how much shelf and cash you have. Remember the line "already ordered but not received". Leaving it out is how shops end up with two orders of the same item arriving in one week.
Bigger orders are not always cheaper. A scheme of "10 cases plus 1 free" helps only if all 11 cases sell well before expiry. Our guide on dead stock in retail shows what happens when they do not.
Worked example 1: a kirana store and its sugar
Take a kirana store in Thrissur, as an example. It sells loose sugar from 50 kg bags. The distributor delivers two days after the order.
- Sales in the last 30 open days: 360 kg, so average daily sales = 12 kg.
- Lead time: 2 days for delivery, plus half a day to open and fill the bins. Call it 3 days.
- Safety stock: sugar brings people in, so keep 3 days, which is 36 kg.
Reorder level = 12 × 3 + 36 = 72 kg. When the stock falls to about one and a half bags, order.
How much? The owner orders sugar about once a week, so days until the next order = 7.
Maximum level = 12 × (3 + 7) + 36 = 156 kg. If the stock in hand is 70 kg and nothing is on order, the order quantity is 156 − 70 = 86 kg, which rounds to 2 bags (100 kg). Rounding up is fine here: sugar does not expire quickly and the extra 14 kg is about one day of sales.
Worked example 2: a medical store with two kinds of supplier
Now a medical store in Coimbatore, again an example. It has two kinds of medicine with very different patterns.
A fast mover from a daily distributor
A common paracetamol tablet sells about 40 strips a day. The local distributor delivers the next morning when ordered by 6 pm, so lead time is 1 day. A stock-out is bad (people will simply walk to the next pharmacy), so safety stock is 2 days, 80 strips.
Reorder level = 40 × 1 + 80 = 120 strips. Because the distributor comes daily, the order can be small: maximum level = 40 × (1 + 1) + 80 = 160 strips. The store never holds more than four days of this item, which keeps cash free and stock fresh.
A slow, costly item from a monthly supplier
A specialist medicine sells about 2 boxes a week, roughly 0.3 a day, and comes from a supplier who visits once a month and then takes 5 days to deliver. Regular patients depend on it, so the store keeps 2 weeks of safety stock, about 4 boxes.
Here the reorder level alone is not enough, because you cannot order whenever you like. You can only order when the supplier visits. That changes the sum, as the next section explains.
When the supplier visits weekly or monthly
The basic reorder level formula assumes you can order on any day. Many Indian shops cannot: the salesman for a company comes on Tuesdays, the cosmetics distributor comes every second week, and some suppliers come once a month. For these, use the "order up to" method at every visit:
Order up to = daily sales × (lead time + days until the next visit) + safety stock
For the slow medicine above: 0.3 × (5 + 30) + 4 = 14.5, so about 15 boxes. If the store has 6 boxes on the visit day, it orders 9.
The weekly salesman works the same way with 7 days instead of 30. The key point: the longer the gap between visits, the more you must order each time, and the more your cash is tied up. If an item from a monthly supplier ties up a lot of money, ask whether another distributor can supply it weekly, even at a slightly higher rate.
| How you order | What to use | Check stock |
|---|---|---|
| Any day, by phone or WhatsApp | Reorder level and maximum level | Daily, or let the software list items below their level |
| Fixed weekly visit | Order up to, with 7 days to the next visit | The evening before the visit |
| Monthly visit | Order up to, with 30 days to the next visit, and more safety stock | The day before, with a count of every item from that supplier |
Mistakes that make the reorder level formula fail
- Wrong stock figures. The formula is only as good as the stock number. If the system says 40 and the shelf has 15, you will order too late. A regular count fixes this; see our guide to stock taking in a retail shop.
- Setting the level once and forgetting it. Sales change with the season. Umbrellas, curd, cool drinks and school notebooks need different levels in different months. Review the levels for your top items every quarter.
- One level for the whole shop. "Order when 10 are left" is wrong for an item you sell 30 of a day and wrong again for one you sell twice a month.
- Ignoring the case size. If an item only comes in cases of 48 and you sell 2 a week, any reorder level gives you six months of stock. Decide whether the item is worth keeping at all.
- Forgetting stock on order. Always subtract what is already coming.
Where to start this week
- Pick your top 30 to 50 items by sales value. They matter most and most shops lose sales when these run out.
- For each one, write the average daily sale, the real lead time and the supplier's visit day.
- Choose safety stock in days, more for items that bring customers in.
- Apply the reorder level formula and work out the maximum level too. Write them on the shelf tag or in your software.
- Check the list before each supplier visit and order up to the maximum.
- After a month, look at which items still ran out and raise their safety stock a little.
If running out is a constant problem, our page on when stock keeps running out covers the other causes too, such as unrecorded sales and wrong counts.
Doing this with Cartix Prime
In Cartix Prime, the Stock report shows which items are running low, and Item-wise sales gives the quantities you need for average daily sales. Purchase entry on every plan keeps stock up to date as goods arrive. Silver adds stock count, so the stock figure the formula depends on is real. Gold adds purchase orders suggested from low stock and sales (sent on WhatsApp or printed, and tracked when part received), supplier rates and smart reorder suggestions. Our page on purchase order software explains that part, and the pricing page lists each plan.